rubyheartscats5165 rubyheartscats5165
  • 23-11-2022
  • Business
contestada

is the difference between the finish date of the last activity on the critical path and the project completion date.
a. Lag time
b.Control limit
c. Total float
d.Contingency time
e.Forward pass

Respuesta :

Otras preguntas

Find the missing value. Hint: Use the number line to find the missing value. -9-+ blank = -3 ​
ions, explain why. |17x – 3x|+ 2 = 18
A group of students was discussing the meaning of this statement. They were arguing back and forward about whether the converse of the statement is also true. J
All of the following are equivalent, except _____. (12 + 3)x 12x + 3x (12 + 3x)x 15x HELPPPPP PLEASE
Which scenario are supposed by the data in charts? Select 3 options
Find the LCM of 6 and 15.
Identify how many significant figures each number has. a. 297 b. 549 c. 4678 d. 327 e. 3006 f. 902 g. 8020 h. 0.0000053 1. 0.00002 j. 0.000506 k. 4000 1. 4000.0
what are the offsprings ​
Why would an aerospace engineer limit the maximum angle of deflection of the control surfaces?
What times what times what equals 121