ejfleck549 ejfleck549
  • 25-05-2023
  • Business
contestada

A project has four major activities. Activity A precedes activity B, activity C precedes activity D. 3-point estimates for activities are A(7.5, 15, 22.5 ), B( 4, 8, 12 ), C( 2, 4, 6 ), D( 9.5, 19, 28.5 ) weeks. What probability would you assign to a project duration of more than 23 weeks?
Select one:
a. 0.75
b. 0.861
c. 0.5
d. 0.388

Respuesta :

Otras preguntas

64/9 in a mixed number
Why was NATO organized? to aid foreign nations recovering from the war to halt the growth of Communism in Europe to divide the conquered territories during the
How Do You Factor 5xy - 10x
Sarah cut off 1/8 of a 48-inch piece of ribbon. Jane cut off 1/9 of a 36-inch piece of ribbon. Whose piece is longer? How much longer?
help What is the solution to the equation? 5(8 + 7) = 5 • x + 5 • 7 A. x = 1 B. x = 5 C. x = 7 D. x = 8
Are the lines 2y-10x=4 and y-2=5x parallel ??
How effective communication will help you in your transition from school to post - school destination
The base of a pyramid is a square, 4.5 cm on a side. The height is 5 cm. Find the volume.
When General Tojo Hideki came to power in Japan, he warned America to remain neutral in the war. True False
why did buddhism become popular in india