soom3154 soom3154
  • 22-04-2024
  • Business
contestada

Calculating how many of each part were used in production and using these calculations to adjust actual on-hand inventory balances is called

a. Kanban pull system
b. Material requirements planning
c. Uniform plant loading
d. Master production schedule
e. Backflushing

Respuesta :

Otras preguntas

Jason had to replace the floor of a triangular portion of his dining room. The portion had a height that was twice as high as the base. If the total area of the
Jim takes great pride in decorating his float for the homecoming parade for his high school. With the $5000 he has to spend, Jim buys 5,000 carnations at $0.30
Displayed formula of 2nonene
uhm, yeah im not very good at math, i need to graduate man, someone help lol
suggest what the effect of using growth hormone on meat cattle might be
What is the sum of the interior angles of a polygon that has 21 sides?
. Write the antonyms of the following words:i. Native:ii. Harmful:1 mnd hehaye like human bei​
if any two ordered pair (2x-3,6)=(x+1,2y/3) find the value of x and y
What are the two definitions of the word Silo?​
Multiple choice! To be dimensionally consistent, velocity [L/T], force [ML/T^2], mass [M], and length [L] must be related as follows. Multiple Choice A. velocit