odeDanienan
odeDanienan odeDanienan
  • 23-04-2016
  • Business
contestada

Based on the following information, what is the Order Point? Lead Time = 3 Weeks Demand/Week = 200 Units Safety Stock = 1 Weeks’ Supply Lot Size = 100 Units

Respuesta :

mulakalav
mulakalav mulakalav
  • 23-04-2016
I don't know by what you meant
Answer Link

Otras preguntas

What was the result of Dante choosing to write the Divine Comedy in Italian rather than Latin?
The goal of sequencing all human DNA base pairs and identifying all human genes belongs to A. restriction enzymes. B. gel electrophoresis. C. the Human Ge
How did religious fundamentalism play a role in the 1998 American embassy bombings?
Cohesion describes water's
How many hours would it take to get from Maine to Colorado?
When did the first Spanish first arrived at Tenochtitlan?
2x=(360/4) solve for x please
Find the perimeter of a triangle with sides 12 inches, 9 inches, and 15 inches.
a trumpet vine is currently 16 inches tall planted next to a 4-foot fence. the trumpet vine grows at an average rate of 1/2 inch per day. at that rate, how many
Which of the following lists the stars in order from least density to greatest density? A. white dwarf, neutron star, main sequence star, giant B. giant, main