Swag3421
Swag3421 Swag3421
  • 23-10-2019
  • Physics
contestada

How much work is done when a 500 N object is moved a distance of 120 m?

Respuesta :

abdulsalambashir3
abdulsalambashir3 abdulsalambashir3
  • 23-10-2019

Answer:60000Nm

Explanation:

Work is said to be done when certain distance is involved.

Work done = force(N) × distance(m)

= 500m × 120N

= 60000Nm

Answer Link

Otras preguntas

what is the slope intercept and standard form for the points (1,5) (2,2) (3,-1)
Commonly understood words that cannot be described using other words
A torch and a battery together cost $15. The torch costs $10 dollar more than the battery. How much does the battery cost?
The graph of the function f(x) = (x + 2)(x + 6) is shown below. On a coordinate plane, a parabola opens up. It goes through (negative 6, 0), has a vertex at (n
Suppose that grade point averages of undergraduate students at one university have a bell-shaped distribution with a mean of 2.61 and a standard deviation of 0.
Question 1 The point (6, y) lies on the line y = -8x + 2. Find y
hello i need helpfffafafafa
me the figure below in two different ways. M Symbol: and C
Geometry question 20 points
Homespun clothing became a symbol of the patriot cause and was associated with spinning clubs formed in response to which of the following?