If it takes a person to dig a garden in 6 days and another person 2 days how many days would it take for them to finish together

Respuesta :

5156323
5156323 5156323
  • 21-11-2019

Answer:

4 Days

Step-by-step explanation:

Because, The 6 day person would slow down the 2 day person to 4 days :)

Answer Link

Otras preguntas

∠A and ∠B are vertical angles. If m ∠A=(2x+26)∘ and ∠B=(3x−29)∘, then find the measure of ∠A.
Please Help! Simplify the expression. [(7−3)⋅2+6]⋅3
The change in shape of a material in response to an applied force is called ______
While analyzing daria's facial shape, you found that she has a wide forehead and a narrow chin. what facial shape does daria have?
A statement about economic behavior or the economy that enables prediction of the probable effects of certain actions is known as a(n) ______.
Which information provided by a client would be considered a presumptive sign of pregnancy?
What command can you utilize to display tcp/ip configuration information for each network adapter installed?
Find the value of x. 141° to 104°
Distributing free condoms to promote safer sex is an example of modifying which construct of hbm?
Erving goffman's emphasis on social interaction (how we act and react to those around us) is part of a much broader subfield in sociology called?