aaliyahgbnl2002
aaliyahgbnl2002 aaliyahgbnl2002
  • 25-03-2020
  • Arts
contestada

What was the role of master builder?

Respuesta :

yusra33khatab
yusra33khatab yusra33khatab
  • 25-03-2020

Answer:

Master builders were responsible for the design, survey, engineering, and management of the construction. In other words, the head builder would be the architect, engineer, and superintendent for each project, Master builder project delivery system and designer construction knowledge

Answer Link

Otras preguntas

Who did Eryn think Dr. Speck and Dr. Grimaldi were? a) Detectives b) Scientists c) Actors d) Spies
Mitosis is a process of cell reproduction in which one cell divides into two identical cells. E. coli is a fast-growing bacterium that is often responsible for
What happens to the alkene when there is H-X (hydrohalogenation) in the presence of peroxide and heat?
Find the area and perimeter of each figure. Include the correct units.
Give 3 reasons why we must fulfill our obligations in the society
Sophia invested $4,500 at a rate of 3.5% compounded annually. How much money will Sophia have in her account after 10 years?
Which one of the following is not a source of Canadian law a. Laws passed by Parliament b. Civil code of FranceIncorrect c. English common law d. Military code
When did the great migration to Western Canada begin? a) 1850 b) 1870 c) 1890 d) 1910
What is the angle of the mountain slope where snow accumulates?
li+cl lici what is the coefficient for lethium