Seudónimo Seudónimo
  • 22-08-2016
  • Mathematics
contestada

Alonso runs a company called Speedy Houses Painters. His workers can paint 3/4 of a house in one day. How many days would it take them to paint 6 houses?

Respuesta :

YosairiBeltran
YosairiBeltran YosairiBeltran
  • 23-08-2016
Divide 3/4 =75
Take that 75 multiply by 6
75•6=450
Answer Link

Otras preguntas

How did the achievements of the Scientific Revolution contribute to the Enlightenment ?
Translating word problems to algebraic expressions:One number exceeds another by 24. The sum of the numbers is 58. What are the numbers?
What is the difference between an isthmus and a strait?A.A strait is a body of land that creates a bridge over a large body of water, and an isthmus is the plac
What is 0.00000008 in scientific notation?
why does the plasma cell have a well developed endoplasmic reticulum with lots of ribosomes
(2x)(x) answer this please
show me the steps for solving this problem how many grams of O2 are required to burn 46.0 grams of C5H12
What is are,perimeter, and type?
show me the steps for solving this problem how many grams of O2 are required to burn 46.0 grams of C5H12
What energy transformations are there in a Ferris Wheel?