The most effective tool for making a project schedule is a ____________ .

A.) notebook
B.) calculator
C.) canlender
D.) graph

Respuesta :

eileenconway eileenconway
  • 30-11-2020
the most effective tool for making a project schedule is a calendar
Answer Link
Wildscrat Wildscrat
  • 29-01-2021

Answer:

C) Calendar

Explanation:

Answer Link

Otras preguntas

7,040,836 what's the value of the digit 4 in this numbers place
If the wheel is spun 100 times how many time would you expect to land on silver
The relative location of a place is its A. relationship to the people who live there. B. location in the south central United States. C. position in relation
The setting of act v for Romeo and Juliet
con base en los rasgos y procedimientos de la comedia que hemos citado en este bloque observa y describe cuales de ellos se resultan en una representacion de t
write the population of Lubbock in word form
what is the sum or product of 8×51
The highest elevation in Asia is 29,028 feet above sea level the lowest elevation is 1,312 feet below sea level what is the difference between these two elevati
how did the introduction of the horse to north america change the native american way of life
What is the taxidistance between (8,17) and (21,32)