math65e math65e
  • 21-10-2016
  • Mathematics
contestada

A carpenter contracts to do a job.The costs for the job are$2,000 for materials,$500 for labor, and $150 for equipment rental.What would be the total cost of the job if the cost of materials were increased by 15%. 1.$300 2.2300 3.2600 4.2800 5.2950

Respuesta :

Аноним Аноним
  • 21-10-2016
i think that the answer is 2,800
Answer Link

Otras preguntas

Did Caligula really make his horse a consul?
What is the volume of the prism? ____ cm3
Explain why U.S. security was threatened as a result of the war between Britain and France.
The key personal decisions that can influence your personal safety while exercising are __________.
What was A risk Helen Keller took?
which describes how probably war differs from a traditional war
Why do you think the Aztecs allowed some conquered peoples to govern themselves with relatively little interference?
A right triangle has legs with lengths 9 cm and 40 cm. What is the length of the hypotenuse?
Can someone help me with my French work i only speak English and Spanish,
a box contains 100 pens.In each box there are 38 black pens and 42 blue pens,while the rest are green pens.Mr.Cane buys 6 boxes of pens.How many green pens does