JoshuaMH
JoshuaMH JoshuaMH
  • 21-10-2016
  • Mathematics
contestada

Click to obtain the correct graph. (Depth uncertainty ± 5 m)
x
y
Depth (m)
Pressure (N)
4
32
12
89
40
250
135
1100
210
1580

Click to obtain the correct graph Depth uncertainty 5 m x y Depth m Pressure N 4 32 12 89 40 250 135 1100 210 1580 class=
Click to obtain the correct graph Depth uncertainty 5 m x y Depth m Pressure N 4 32 12 89 40 250 135 1100 210 1580 class=
Click to obtain the correct graph Depth uncertainty 5 m x y Depth m Pressure N 4 32 12 89 40 250 135 1100 210 1580 class=
Click to obtain the correct graph Depth uncertainty 5 m x y Depth m Pressure N 4 32 12 89 40 250 135 1100 210 1580 class=

Respuesta :

rcody0207
rcody0207 rcody0207
  • 20-09-2017
it's the first picture
Answer Link

Otras preguntas

What natural features bounded development for the city of new orleans?
Who signed the atlantic charter? a. roosevelt and hitler c. germany and the soviet union b. france and germany d. churchill and roosevelt user: soviet armie
The rule (x, 3/4y) is applied to a polygon. Is the image similar to the original polygon? Explain.
what important message for juliet does romeo tell to the nurse
Why does adam richman always wear a jacket?
why was a feudal contract so important to a manorial economy
President lincoln's top priority when it came to the civil war was to _____. end slavery as soon as possible preserve peace in congress by compromising allow sl
Hich of these describes the effect of the marbury v. madison decision?
What will be a unit measure for a canyon?
Companies who operate around the Dead Sea have constructed evaporation ponds to remove __________ from the waters, which are then processed for industrial uses.