jennibalaoing
jennibalaoing jennibalaoing
  • 24-05-2021
  • Mathematics
contestada

Johnson Construction Company is going to build a house on a concrete slab. The slab is to have dimensions 30 feet by 20 feet by 2 feet. How many cubic feet of concrete should the construction company order

Respuesta :

ursupacool ursupacool
  • 27-05-2021

Answer:

1200ft^3

Step-by-step explanation:

30 x 20 x 2= 1200^3

Answer Link

Otras preguntas

(blank)______ is the measure of a star's brightness as seen from Earth.
Opportunity cost is MOST RELATED which concept? A. Price floors b.scarcity c.elasticity d.adsolute advantage
Find the the slope of the line that contain 5,3 and -1,4
Knowing that all three-sided figures are triangles is an example of: O A. idea grouping. O B. concept formation. O c. identity formation. D. accommodation. SUBM
On a circle with radius 12 m, what angle would subtend an arc with a length of 7 m?
1) Wood has a density of 5.53g/cm3. What must the volume of 33.3 g of wood?
Simplify the expression 3 4 (1440) + 295.25 + (-33.50) to determine how much money the theater brought in.
can i use any shampoo and conditioner after getting a balayage
Scribe the relief features of Telangana​
How to divide 2.4/50?