babyfacelay657 babyfacelay657
  • 22-07-2021
  • Mathematics
contestada

sentence
After several days of drilling, a water well is 80
meters deep. The well is being drilled at a rate of
20 meters per day.
How many more days will it take to reach a total
depth of 180 meters?

Respuesta :

princesselizajaosa
princesselizajaosa princesselizajaosa
  • 22-07-2021

Answer:

it will take 5days to reach a total of 180meters

Step-by-step explanation:

80m+20+20+20+20+20

=180meters

=5days

Answer Link

Otras preguntas

Define the term light
How do we know that air we breathe is matter?
Examples and Non Examples of Sovereignty
List the four factors that affect the size of population? Plz help
how many nucleotides of the human genome ?
According to the lesson, who suffered the most due to the lack of unity in the Federal government during the years of Reconstruction? A.)the president B.)Northe
Use your calculator to determine the answer to the following calculation: 1.0×10−154.2×10−7
Find two consecutive even integers such that four times the first plus three times the second is 20
How does Bradford diction reveal his own thoughts and feelings about the events. Of Plymouth plantation
You forgot to break the vial in the culturette before you sent it out to the lab . The lab rejected the specimen. Why.