ganeshsekark ganeshsekark
  • 21-10-2021
  • Mathematics
contestada

In a project there are 560hrs

Respuesta :

2wnantalemaria
2wnantalemaria 2wnantalemaria
  • 21-10-2021

Answer:

560hrs

Step-by-step explanation:

1day=24hrs

560hrs=(560÷24)days

=23.333days

Answer Link

Otras preguntas

I need a little help here! :/ Fill in the blanks with the present tense form of saber or conocer. Ana ______ hablar español y francés. Ustedes no _______ a mi
how many tens in 2010
Which of the following is most likely to be an observation made by an anatomist?
Assume that y varies inversely with x. If y=7 when x=2/3, find y when x=7/3
Suppose that 11% of all steel shafts produced by a certain process are nonconforming but can be reworked (rather than having to be scrapped). Consider a random
a sample of substance x that has a mass of 326.0 g releases 4325.8 cal when it freezes at its freezing point. if substance x has a molar mass of 58.45 g/mol, wh
What latitude are most lightly to see glaciers
hansika paid $9.25 for 2.8 pounds of pretzels. about how much did she pay for a pound of pretzels?
Select the time period of my adventures: I left to discover Canada.
1)What is the additive inverse of 4x? A. 4 – x B. –4x C. 1/4x D. x – 4 2)Does 4x + (4 -x) = 0? Does 4x + (-4x) = 0? Does 4x + (1/4x) = 0? Does 4x + (x - 4) = 0?