yasmin5646 yasmin5646
  • 22-07-2022
  • Computers and Technology
contestada

During the maintenance phase of the software development life cycle, the information system is ______

Respuesta :

eclose441
eclose441 eclose441
  • 24-07-2022
Design

Explanation:

After the maintenance phase, next you need to design or build the information system
Answer Link

Otras preguntas

Still under construction, jefferson was the first president to take the oath of office at the capitol. which revision corrects the dangling modifier in the sent
What is equal to 10^12/10^-3a. 10^36b. 10^-4c. 10^9d. 10^15?
A crane used 900 N of force to lift a load 100 m. How much work did the crane do?
If f(x) = -(1/x^3) and x takes on successive values from -10 to 0.1 , a) f(x) increases throughout b) f(x) decreases throughout c) f(x) increases, the
Where did the Louisiana purchase occur?
Which countries where bound to each other by which alliance i'm world war 1?
11) vacuoles are largest in ___________ cells.
In the teapot dome scandal, what did the secretary of the interior albert fall lease
EROSION occurs when natural forces alter a landscape. What does it mean to alter a landscape?
Express each of the following to four significant figures 3983.4 444.18 189100 33100 6.302×10−4 5.0472×10−4