douggie2345
douggie2345 douggie2345
  • 22-05-2017
  • Mathematics
contestada

If 6 workers can cut the grass in 4 hours, how many workers will be needed to cut the grass in 3 hours?
A. 2 workers
B. 8
C. 12
D. 24

Respuesta :

Joshisboss
Joshisboss Joshisboss
  • 22-05-2017
The answer for this question is B
Answer Link

Otras preguntas

where do u think amazonite is found? explian plzz i need help!!!!
Which of the following describes how Diocletian affected the Roman Empire? He raised taxes, which angered the citizens and led to uprisings. He reduced the size
The main element involved in basing is A. theme. B. line. C. texture. D. color.
The black arrow in the picture above is pointing to an organelle that is packaging and shipping substances out of a cell. What is this organelle? a. nucleus b.
How can you express (15 30) as a multiple of a sum of whole numbers with no common factor?
Different types of matter melt at different temperatures True or False
which european country entered world war 1 as part of the central powers but later switched sides to the allies in 1915
A zebra starts from rest and accelerates at 1.9 m/s how far has a zebra gone in five seconds
What is the name for a group of warmblooded animals with hair or fur?
by the beginning of World War 1 how much of the world's population within a colony