Johnson's rule gives optimal answer for what type of scheduling problems?

Respuesta :

Etta217
Etta217 Etta217
  • 06-11-2017
The answer is two-machine flow shop. The two-machine flow shop issue in which each activity is prepared through an in-house framework or outsourced to a subcontractor. A calendar is set up for the in-house employments, and execution is measured by the makespan.
Answer Link

Otras preguntas

Can someone tell me the right answer to this plsss and thank you
Steven bought 100 tokens for $ 125. Lola bought 50 tokens for $ 110 are the ratios equivalent
How do you annotate a graph?
which amendment makes the government pay the owner of a house before they can build a highway on the property
there are 44 people working at the plaza office building. Tuesday 3/4 of the worked overtime. how many people worked overtime?
What is 4 + 5 + 167+%677
What kind of animal do the Governor and the other men suggest Pearl is?
Which body of water does the St. Lawrence River flow into? Atlantic Ocean Lake Superior Pacific Ocean Gulf of Mexico
The population of grovestown was 4200. It dropped 80 each year for 6 yr. What was the population after 6 yr.?
How was the writing styles of Romeo and Juliet and Ovid’s Pyramus and Thisbe similar?