Relative to the project's life cycle, when is the cost per risk discovered typically highest

Respuesta :

andriansp andriansp
  • 01-12-2017
Relative to the project's life cycle, the cost per risk discovered is typically highest during the end of closing of a project.
For any project, a lot of risk will only be spotted after the company started its own operation. Because up to this point, the company usually already determine which type of risk is the most likely to happen.
Answer Link

Otras preguntas

The English Bill of Rights influenced the American colonists' belief that:A the government should not interfere with certain freedoms. B no person should experi
How to write a letter of gratitude
what will bea do? what will she need​
A federally funded research study involving children 8 to 12 years old involves collecting a single voided urine sample to assess the frequency of asymptomatic
which city is known for the whimsical architecture of architect antoni gaudí?
The sum of two numbers is eight one number is four less than the other find the numbers
A barrel of oil was filled at a constant rate of 7.9 gal/min. The barrel had 12 gallons before filling began.
why do alkaline Solutions feel slippery when damp Between Two Fingers​
What do you see yourself achieving in the future? (think of school, occupation, family, living location etc)
according to a 2015 u.s. census bureau report, what percentage of u.s. children live in poverty?